Size
55.000 m2 offices, 18.000 m2 parking
Client
Rijks- gebouwendienst Directie Oost - Arnhem
Year
2007
The Walterbos complex consists of five already existing buildings that have been renovated. Between these buildings a plinth building has been constructed on which two towers of 60 m high have been placed. Two underground parking garages complete the project.
Both the renovations and the new constructions have taken place while the other buildings where still in use. When, because of phasing or construction mechanics, hindrance could not be prevented, trouble was restricted by adapting specific working hours. The structure of the plinth building consists of poured concrete and (earth-retaining) walls. The rest of the supporting structure consists of innovative exposed concrete. The towers have been constructed of weight saving floors on columns around a core of poured exposed concrete. The parking garages have been executed as wide slab floors on columns. The entire project has been founded on steel. The constructions of this projects required high-quality visual finish, as much of the concrete is a design element and very clearly visible. Because of the good preparation that such a finish entails, technical execution ran very smoothly. Both the client (Rijksgebouwendienst) as well as the user (Belastingdienst), were closely involved in both preparation as well as the execution of this project.
The new headquarters of the European Patent Office (EPO) in The Hague has been one of the largest Dutch building projects of the past few years. Not only the size of the project was exceptional. The building has been delivered with a unique concept: the design has a dubbel facade which has an internal space (between the facades) of 8 meters.
Recently, the EPO building was awarded the international prize for "Best Tall Office Building"!
NEW, THE HAGUE, HIGH-RISE, OFFICES
De Ovale Toren ligt naast het woon- winkelcentrum Arena in Amsterdam. Onder het gehele project ligt een ondergrondse parkeergarage.
De hoogbouw is grotendeels uitgevoerd in prefabbeton, de stabiliteitsvoorzieningen zijn echter met behulp van een stalen outrigger constructie uitgerust. Hierdoor is de kern van het gebouw minder zwaar uitgevoerd en wordt de gevel gemobiliseerd als stabiliserend element. In 2010 heeft de Ovale Toren een ´update´ gekregen: de entree is verplaatst en vergroot door het slopen van 3 vloeren, waardoor een imposante entreehal is ontstaan (zie foto). Ook de luifel op de 2e verdieping is aanzienlijk uitgebreid.
De Ovale Toren heeft als eerste gebouw in Nederland het duurzaamheidscertificaat “LEED Gold” voor een bestaand gebouw gekregen.